Demolition insurance is built around one fact: the job is to bring a structure down without hurting anyone or damaging anything next to it. Underwriters treat demolition as its own class of work, separate from general building, and a policy written for a builder or an excavation contractor may not respond the way a demolition contractor expects. This guide works through the parts of a demolition insurance programme that decide how a claim goes: the occupation wording, adjoining property, asbestos, plant and the contract you sign.
Why Demolition Sits in Its Own Class
An underwriter pricing demolition work wants to know what you pull down and how you do it. A residential knock-down on a wide suburban block is a different risk from a commercial strip-out inside an occupied building, and both differ from structural demolition of a multi-storey frame beside a busy street.
Expect questions on:
- Type of work. Residential, commercial or industrial; full demolition, partial demolition or internal strip-out.
- Height and structure. Single-storey timber and brick versus concrete frames, steel structures, towers and chimneys.
- Method. Mechanical demolition with excavators and attachments, high-reach machines, hand demolition, concrete cutting and sawing, or crane-assisted dismantling.
- Proximity. Distance to neighbouring buildings, public roads, footpaths, rail lines and live services.
- Related work. Site clearing, excavation, salvage and recycling, and any asbestos-related work.
Demolition Insurance Starts With the Occupation Wording
Public liability responds to the business activities described on the schedule. If the occupation reads “residential demolition” and you take on a four-storey commercial job, you may find the policy does not respond to that job at all. Our article on why the occupation matters on liability policies explains how that plays out at claim time.
Check the wording for:
- height or storey limits on the work you can undertake;
- exclusions for structural work, underpinning, or work on heritage-listed buildings;
- whether excavation and site clearing are included or need to be declared separately;
- how work done by your subcontractors is treated;
- limits of liability that match the contracts you sign, as discussed in our guide to public liability limits for contractors.
When the business changes, tell your broker before you quote the new type of work, not after the machines are on site.
Adjoining Property: the Claim That Arrives Later
Damage to neighbouring property is the defining liability exposure in demolition. It often turns up weeks later as cracked render, a sagging party wall, a lifted slab, or water getting into a neighbour’s building through a wall that used to be protected by the structure you removed.
The causes are familiar: vibration from breaking concrete, removal of support when an abutting wall loses the structure it leaned on, falling debris, dust and slurry entering neighbouring premises, and direct contact from machinery.
Liability wordings deal with vibration and with removal or weakening of support in different ways. Some exclude it outright, some include it with a sub-limit, and some include it only where specified precautions were taken. Know which one you hold before you start a job next to an occupied building.
A dilapidation report on neighbouring buildings before work starts is the document that settles these disputes. Photographs, crack measurements and a written description of existing condition, taken before the first machine arrives, separate old damage from damage you caused. Without one, a neighbour’s claim is hard to defend even when the cracks were there for years.
Asbestos: Read the Exclusion Before You Quote
Asbestos-containing materials are still found in older buildings, and demolition is where they are disturbed. Liability policies commonly carry an asbestos exclusion, and the breadth of that exclusion varies between wordings. Some exclude any claim arising from asbestos in any way. Others are narrower. The difference matters when a neighbour, a member of the public or a later occupier alleges exposure.
Points to settle with your broker:
- what the asbestos exclusion on your liability policy actually says;
- whether any asbestos-related work you do, including removal, is declared on the policy;
- whether specialist cover for asbestos-related liability is available for your operations, and on what terms;
- how the policy treats contamination and clean-up costs if material is released beyond the site boundary.
Licensing, notification and removal requirements for asbestos work vary by state and territory and by the type of work involved. Check the current requirements with the regulator where the job is located before you quote, and confirm that anyone removing asbestos on your job holds whatever licence that work calls for.
Plan for the unexpected find. Build a clause into your quotes and contracts that deals with asbestos discovered after work begins: work stops, the material is assessed, and the cost and time are handled as a variation. That protects the contract price, and it removes the pressure on a crew to keep going.
Plant and Attachments
Demolition plant works in harder conditions than general earthmoving gear. Excavators fitted with hydraulic hammers, pulverisers, shears, grabs and crushing buckets work close to falling material, and high-reach machines carry large values on a single unit.
- List every attachment with its value. Attachments are frequently specified separately from the machine.
- Check for exclusions relating to damage from falling debris or collapse of the structure being demolished.
- Declare hired-in machines and read the hire agreement. See our guide to hired-in plant insurance.
- Confirm how machines are protected while floated between sites, including loading and unloading.
What Principals Commonly Ask For
Builders, developers and government principals engaging demolition contractors commonly ask for:
- a public liability limit set in the contract, sometimes higher than your standard limit for a particular job;
- the principal noted as an interested party on your liability policy;
- a waiver of subrogation or a cross liability clause;
- certificates of currency for liability, plant, motor vehicles and workers compensation;
- evidence of the insurance held by your subcontractors;
Workers compensation requirements vary by state, so check the current requirement for each state you work in. Read the insurance and indemnity clauses before you sign. A contract that makes you responsible for losses beyond your legal liability can leave a gap your policy does not fill. Our guide to subcontractor insurance requirements covers the paperwork to collect from the subcontractors you bring on.
Where Demolition Meets a Larger Project
When demolition is the first stage of a new build, the project’s contract works policy may be arranged by the principal or the head contractor. Check whether your demolition work falls within it, whether you are named as an insured, and whether retained structures, such as a heritage facade, are part of the insured works. The construction industry page covers the wider programme around a building project.
Putting the Programme Together
- Public liability with an occupation that describes each type of demolition you do, at limits that match your contracts.
- A clear position on vibration, removal of support and asbestos, confirmed in writing.
- Plant and attachments at replacement value, plus hired-in plant.
- Motor cover for trucks, tippers and floats, with the right vehicle use.
- Workers compensation in each state you work in, and personal accident for working principals.
- Dilapidation reports and site records kept for every job.
Our demolition insurance page sets out how we place this cover for contractors of different sizes.
Common Questions
Will my policy respond if a neighbour’s wall cracks during a job?
It depends on the wording, particularly how it treats vibration and removal of support, and on whether the damage can be shown to have been caused by your work. A dilapidation report taken before you started is often what decides the claim.
Can I get insurance for asbestos-related work?
Some asbestos-related exposures can be insured, depending on the work, your procedures and the market at the time. Tell your broker exactly what you do with asbestos, and read the exclusion on your current policy first.
Do I need a separate policy for each job?
Not usually. An annual policy can respond to your work across the year, provided the occupation and limits fit. Raise any unusually large job before you sign.